
01 · Record the first operation
What the team finds
Packing totals hide short stops and time waiting for packaging materials. Align product runs and changeovers with the corresponding line activity.
02 · Decide at a later review
Who acts, and what changes
Responsible team · Winery and packing lead
In the later line review, approve packaging preparation and a changeover handover. Assign the material and line leads before the next product switch.
03 · Verify in the next comparable operation
How the team checks the result
For equivalent products and batch sizes, verify preparation. Compare packed cases per run hour, stop duration and changeover time.